This Supplemental / Bid Bulletin is issued to clarify, modify or amend items in the Bid Documents of the following requirements:
|
MANILA FAME APRIL 2019 REQUIREMENTS |
|
|
SOLICITATION NO. |
TITLE |
1 |
2019-0095 |
Fashion E-Tailers of Manila FAME April 2019 |
2 |
2019-0096 |
Convergence Lounge of Manila FAME April 2019 |
3 |
2019-0097 |
Manila FAME Bar - Rental for Manila FAME April 2019 |
4 |
2019-0098 |
Visual Merchandise Props for Manila FAME April 2019 |
5 |
2019-0099 |
Manila FAME Lounge @ Hall D Lobby |
6 |
2019-0100 |
Magazine Kiosk for MFA |
As discussed during the Pre-Bid Conference on 04 April 2019, this shall form part as amendment of the Bid documents:
CLARIFICATIONS:
- On Scope of Work:
4.) The contractor shall install the items properly and in good condition (without smudge, dirt, and stains and the like) on 23 APRIL 2019 between 8AM to 12MN and dismantle on the egress on 27 APRIL 2019 at 7PM onwards. |
AMENDMENTS:
- On Convergence Lounge of Manila FAME 2019 with Solicitation No. 2019-0096
SPECIFICATIONS |
FROM |
TO |
||
PARTICULARS |
QUANTITY |
PARTICULARS |
QUANTITY |
|
Design A |
II. 3.6m x 4m Wall |
2 sets |
3.85m x 0.1m x 3.6m wall |
4 sets |
IV. 3.4m x 3m Wall |
2 sets |
|||
III. 1.5m x 1.5m column cladding |
2 sets |
1.5m x 0.1m x 3.6m Wall |
4 sets |
|
Design B |
II. 5.7m x 4m Wall |
2 sets |
||
IV. 4m x 3m Wall |
2 sets |
4.4m x 0.1m x 3.6m Wall |
4 sets |
|
III. 1.5m X 1.5m column cladding |
2 sets |
|||
Design A |
V. ¾ PLYWOOD FLOORING 36 sq.m flooring in 3/4” Plywood (A.P.F.) |
2 sets |
36 sq.m Flooring in ¾” Plywood A.P.F. |
4 sets |
Design B |
V. ELEVATED PLATFORM Elevated Platform in ½” Plywood with Framing |
2 sets |
||
VI. ¾” PLYWOOD FLOORING 26.2 sq.m Flooring in ¾” Plywood (A.P.F.) |
2 sets |
|||
NOTE: Attached is the revised Request for Quotation Form (RFQ No. 2019-03-0097 rev.1) for perusal. |
Items not mentioned above remain the same.
This Supplemental/Bid Bulletin is being issued to clarify/modify/amend the specifications of the requirement needed, and not for purposes of delaying the proceedings of RA 9184.
Issued this 04th day of April 2019.
ATTY. ANNA GRACE I. MARPURI (SGD.)