Procurement: SUPPLEMENTAL / BID BULLETIN No. 2016-01 Supply, Installation, Dismantling and Hauling for Manila Wear Setting Re: Manila FAME April 2016




CITEM BIDS AND AWARDS COMMITTEE

SUPPLEMENTAL / BID BULLETIN No. 2016-01

Supply, Installation, Dismantling and Hauling for Manila Wear Setting

Re: Manila FAME April 2016

To all Prospective bidders:

This Supplemental / Bid Bulletin is issued to clarify, modify or amend items in the Bid Documents. This shall form part of the Bid documents:

Particular From To

 

Specification:

Framing of Tubular Painted Steel with Sheer Fabric as Divider

 

2.5m (h)

3m (h)

 

Specification:

Brand Board Structure

 

3m (h)

3.5m (h)

 

Approved Budget for the Contract (ABC)

 

PHP283,107.98

PHP298,108.14

 

Opening of Bids

 

April 12, 2016

(05:30pm)

April 14, 2016

(03:30pm)

Items not mentioned above remains the same.

This Supplemental/Bid Bulletin is being issued to modify/amend the specifications of the requirement needed, and not for purposes of delaying the proceed­ings of RA 9184.

Issued this 7th day of April 2016.

                                                                         MARIA RITA O. MATUTE

                                                                       Chairman, Bids and Awards Committee