Procurement: SUPPLEMENTAL / BID BULLETIN No. 2015-01 Fabrication, Delivery & Installation of Customized Metal Racking System
CITEM BIDS AND AWARDS COMMITTEE
SUPPLEMENTAL / BID BULLETIN No. 2015-01
Fabrication, Delivery & Installation of Customized Metal
Racking System
To all Prospective bidders:
This Supplemental / Bid Bulletin is issued to clarify, modify or amend items in the Bid Documents. This shall form part of the Bid documents:
The following are the new specifications for the said requirement:
v 3 set Long Span Racks 27.00 sq.meter H: 3.00m L: 8.10-8.50m W: 2.70m
v 1 set Selective Racks 46.80 sq.meter H: 3.00m L: 14.30m W: 2.40m
v 1 set Cantilever Racks 18.90 sq.meter H: 3.00m L: 10.50 W: 1.80m
(double sided; 2levels)
v Weight Capacity: 1,000-1,500 kg. per level
v Delivery Period: 30 days for Long Span Racks and Selective Racks
: 90 days for Cantilever Racks
v 1/10 of 1% of the total amount of undelivered items will be deducted per day.
Items not mentioned above remains the same.
This Supplemental/Bid Bulletin is being issued to modify/amend the specifications of the requirement needed, and not for purposes of delaying the proceedings of RA 9184.
Issued this 09th day of January 2015.
MA. LOURDES D. MEDIRAN
Chairman, Bids and Awards Committee